banner

Blog

Jun 28, 2023

Shielding Plan Requirements

Prior to construction, you must submit a:

Once DHEC receives all three, we will:

Once your equipment is installed, you must submit "as-built" drawings and the area survey (if applicable) to DHEC along with DHEC's As-Built/Area Survey Submission Form.

Consult our Shielding Design Regulatory Guidelines (pdf) for clarification on South Carolina's requirements.

prior
SHARE