Jun 28, 2023
Shielding Plan Requirements
Prior to construction, you must submit a:
Once DHEC receives all three, we will:
Once your equipment is installed, you must submit "as-built" drawings and the area survey (if applicable) to DHEC along with DHEC's As-Built/Area Survey Submission Form.
Consult our Shielding Design Regulatory Guidelines (pdf) for clarification on South Carolina's requirements.
priorPrev: A Printable Multi